Logo
Explore Help
Sign In
herryyun/ark-stronghold-protocol
Watch 1
Star 0 Fork 0
Code Issues Pull Requests Actions Packages Projects Releases Wiki Activity
807 Commits 1 Branch 0 Tags
4bd154e3265d299dd511ec032fbce0fb9b9c8bce
Commit Graph
1 Commits
Author SHA1 Message Date
sganggs d84b961c80 feedback6 R21G: a b.start is registered as pending before the sim loads, so a b.end (takeover / forced, the first end counts), a second b.start of the same battle, b.pool and the solo pause that arrive during the load or the silent catch-up are applied to it in order once the Battle exists (they were dropped); a superseded authority is still built, the next prep's clear stops the preparation (PR #266 by @siruimei07, re-implemented on the current runner); docs/design/network.md §14 Client runner + b.end; golden: unchanged 2026-10-07 17:51:26 +08:00
Powered by Gitea Version: 28.1.0 Page: 26ms Template: 2ms
Auto
English
Bahasa Indonesia Deutsch English Español Français Gaeilge Italiano Latviešu Magyar nyelv Nederlands Polski Português de Portugal Português do Brasil Suomi Svenska Türkçe Čeština Ελληνικά Български Русский Українська فارسی മലയാളം 日本語 简体中文 繁體中文(台灣) 繁體中文(香港) 한국어
Licenses API