Logo
Explore Help
Sign In
herryyun/ark-stronghold-protocol
Watch 1
Star 0 Fork 0
Code Issues Pull Requests Actions Packages Projects Releases Wiki Activity
971 Commits 1 Branch 0 Tags
38121e8d33ece0373fa444b94bb963608b54ead3
Commit Graph
1 Commits
Author SHA1 Message Date
sganggs d84b961c80 feedback6 R21G: a b.start is registered as pending before the sim loads, so a b.end (takeover / forced, the first end counts), a second b.start of the same battle, b.pool and the solo pause that arrive during the load or the silent catch-up are applied to it in order once the Battle exists (they were dropped); a superseded authority is still built, the next prep's clear stops the preparation (PR #266 by @siruimei07, re-implemented on the current runner); docs/design/network.md §14 Client runner + b.end; golden: unchanged 2026-10-07 17:51:26 +08:00
Powered by Gitea Version: 28.3.0 Page: 25ms Template: 1ms
Auto
English
Bahasa Indonesia Deutsch English Español Français Gaeilge Italiano Latviešu Magyar nyelv Nederlands Polski Português de Portugal Português do Brasil Suomi Svenska Türkçe Čeština Ελληνικά Български Русский Українська فارسی മലയാളം 日本語 简体中文 繁體中文(台灣) 繁體中文(香港) 한국어
Licenses API